alcance de reparación del registro de capacidades
Owner: Infrastructure. Needs a response.
Ask the team →View task record
NEEDS_INPUT: alcance de reparación del registro de capacidades
Last activity: Tue, Sep 8, 5:32 PM. Reference: t_58acc302.
Review what is running, what is blocking it and who owns it.
402 tasks in this view. Completed tasks are kept in history.
Owner: Infrastructure. Needs a response.
Ask the team →NEEDS_INPUT: alcance de reparación del registro de capacidades
Last activity: Tue, Sep 8, 5:32 PM. Reference: t_58acc302.
Owner: Infrastructure. Completion needs verification.
Ask the team →OWNER DECISION — NORTH sidecar mismatch blocks dispatcher
Last activity: Tue, Sep 8, 2:58 PM. Reference: t_52c1220c.
Owner: Infrastructure. Needs a response.
Ask the team →[VIGILANTE needs_input] M1 Codex credential ownership and registry decision
Last activity: Tue, Sep 8, 12:42 PM. Reference: t_4d656cdf.
Owner: Inspector. Access required.
Ask the team →[P1][INFRA][ornith-repair-forge] Repair Trinidad fail-closed regression
Last activity: Tue, Sep 8, 11:46 AM. Reference: t_3f705fc5.
Owner: Infrastructure. Needs a response.
Ask the team →OWNER DECISION: GLM Brain drain vs desired-services contract
Last activity: Tue, Sep 8, 9:57 AM. Reference: t_65c6536d.
Owner: Infrastructure
Ask the team →OWNER DECISION: Codex profile credentials and retired-profile scope
Last activity: Tue, Sep 8, 9:34 AM. Reference: t_841c9118.
Owner: Infrastructure
Ask the team →[INFRA SANDBOX] Cloudflare stateful agent retrieval dossier
Last activity: Tue, Sep 8, 9:21 AM. Reference: t_f6eb9367.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA][BOARD] Repair preserved completion retry to accept NORTH applicability
Last activity: Tue, Sep 8, 8:44 AM. Reference: t_5170bfa2.
Owner: Infrastructure. Needs a response.
Ask the team →[INFRA] Local canary — generative illustration deterministic motion
Last activity: Tue, Sep 8, 8:26 AM. Reference: t_f786d7e2.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Manim local render canary — replacement root
Last activity: Tue, Sep 8, 2:28 AM. Reference: t_d0d2d7a3.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canario local: kinetic-typography standalone
Last activity: Tue, Sep 8, 2:26 AM. Reference: t_e7a329df.
Owner: Infrastructure
Ask the team →[P0][INFRA] Reconciliar completion NORTH de t_476e220c
Last activity: Tue, Sep 8, 2:24 AM. Reference: t_6839e035.
Owner: Infrastructure
Ask the team →Canario local — animation-principles
Last activity: Tue, Sep 8, 2:22 AM. Reference: t_2f51109b.
Owner: Infrastructure
Ask the team →[INFRA] Manim installed-skill local render canary
Last activity: Tue, Sep 8, 2:22 AM. Reference: t_5bffdd37.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary installed capability — wrapped-video
Last activity: Tue, Sep 8, 2:21 AM. Reference: t_34c9d157.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Canary local — isometric-animation capability
Last activity: Tue, Sep 8, 2:18 AM. Reference: t_5bf65f92.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary: whiteboard-animation standalone HTML/SVG capability
Last activity: Tue, Sep 8, 2:15 AM. Reference: t_0ec006eb.
Owner: Infrastructure. Needs a response.
Ask the team →Repair stuck NORTH completion retry for t_69b9bede
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_c47f065a.
Owner: Infrastructure
Ask the team →[CANARY] explainer-video text pipeline — no render/audio
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_2a3cb297.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary: diagram-animation standalone HTML/SVG capability
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_3703ed95.
Owner: Infrastructure. Needs a response.
Ask the team →[MIAMI] Evaluar mover las 4 lanes de Miami al GLM local, con evidencia y sin tocar la operacion
Last activity: Mon, Sep 7, 11:22 PM. Reference: t_58738a16.
Owner: Infrastructure. Needs a response.
Ask the team →[INFRA] Probar con medicion el paso a GLM local de orchestrator, inspector e infra (una por vez)
Last activity: Mon, Sep 7, 11:21 PM. Reference: t_03872980.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Recuperar los 20 tok/s del GLM: probar fast_synch=1 y prefill 4096, fuera de horario y con medicion
Last activity: Mon, Sep 7, 11:11 PM. Reference: t_71fae5ba.
Owner: Infrastructure. Access required.
Ask the team →[INFRA] Vigilar 48 h los dos GLM enteros y subir el trabajo en paralelo
Last activity: Mon, Sep 7, 10:54 PM. Reference: t_e2234366.
Owner: Infrastructure. Access required.
Ask the team →[P0][REPAIR] Reconcile live gateway caller source paths to canonical isolated runtime
Last activity: Mon, Sep 7, 9:10 PM. Reference: t_1951e574.