Technical team review
Owner: Infrastructure. Completion needs verification.
Ask the team →View task record
[INFRA] Manim local render canary — replacement root
Last activity: Tue, Sep 8, 2:28 AM. Reference: t_d0d2d7a3.
Review what is running, what is blocking it and who owns it.
314 tasks in this view. Completed tasks are kept in history.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Manim local render canary — replacement root
Last activity: Tue, Sep 8, 2:28 AM. Reference: t_d0d2d7a3.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canario local: kinetic-typography standalone
Last activity: Tue, Sep 8, 2:26 AM. Reference: t_e7a329df.
Owner: Infrastructure
Ask the team →[P0][INFRA] Reconciliar completion NORTH de t_476e220c
Last activity: Tue, Sep 8, 2:24 AM. Reference: t_6839e035.
Owner: Infrastructure
Ask the team →Canario local — animation-principles
Last activity: Tue, Sep 8, 2:22 AM. Reference: t_2f51109b.
Owner: Infrastructure
Ask the team →[INFRA] Manim installed-skill local render canary
Last activity: Tue, Sep 8, 2:22 AM. Reference: t_5bffdd37.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary installed capability — wrapped-video
Last activity: Tue, Sep 8, 2:21 AM. Reference: t_34c9d157.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Canary local — isometric-animation capability
Last activity: Tue, Sep 8, 2:18 AM. Reference: t_5bf65f92.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary: whiteboard-animation standalone HTML/SVG capability
Last activity: Tue, Sep 8, 2:15 AM. Reference: t_0ec006eb.
Owner: Infrastructure. Needs a response.
Ask the team →Repair stuck NORTH completion retry for t_69b9bede
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_c47f065a.
Owner: Infrastructure
Ask the team →[CANARY] explainer-video text pipeline — no render/audio
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_2a3cb297.
Owner: Infrastructure. Completion needs verification.
Ask the team →Canary: diagram-animation standalone HTML/SVG capability
Last activity: Tue, Sep 8, 2:10 AM. Reference: t_3703ed95.
Owner: Infrastructure. Needs a response.
Ask the team →[MIAMI] Evaluar mover las 4 lanes de Miami al GLM local, con evidencia y sin tocar la operacion
Last activity: Mon, Sep 7, 11:22 PM. Reference: t_58738a16.
Owner: Infrastructure. Needs a response.
Ask the team →[INFRA] Probar con medicion el paso a GLM local de orchestrator, inspector e infra (una por vez)
Last activity: Mon, Sep 7, 11:21 PM. Reference: t_03872980.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INFRA] Recuperar los 20 tok/s del GLM: probar fast_synch=1 y prefill 4096, fuera de horario y con medicion
Last activity: Mon, Sep 7, 11:11 PM. Reference: t_71fae5ba.
Owner: Infrastructure. Access required.
Ask the team →[INFRA] Vigilar 48 h los dos GLM enteros y subir el trabajo en paralelo
Last activity: Mon, Sep 7, 10:54 PM. Reference: t_e2234366.
Owner: Infrastructure. Access required.
Ask the team →[P0][REPAIR] Reconcile live gateway caller source paths to canonical isolated runtime
Last activity: Mon, Sep 7, 9:10 PM. Reference: t_1951e574.
Owner: Infrastructure. Needs a response.
Ask the team →NEEDS_INPUT: autorizar o revertir drift no append-only de NORTH-CURRENT (dispatcher bloqueado)
Last activity: Mon, Sep 7, 6:48 PM. Reference: t_ffae9d0b.
Owner: Infrastructure. Completion needs verification.
Ask the team →[INSPECTOR][P1] COO reporter omits actual persistence-supervisor scheduled failure
Last activity: Mon, Sep 7, 5:30 PM. Reference: t_794b61f3.
Owner: Infrastructure. Completion needs verification.
Ask the team →[P1][INSPECTOR][INFRA] Persist native-browser screenshots for visual audit receipts
Last activity: Mon, Sep 7, 5:20 PM. Reference: t_2148fb19.
Owner: Inspector. Retry needed.
Ask the team →[VERIFY NEXT DAY][NIDO] OAuth circuit loop counter suppression
Last activity: Mon, Sep 7, 5:12 PM. Reference: t_8e041aff.
Owner: Infrastructure. Completion needs verification.
Ask the team →[DUEÑO] chequeo radar_activity en FAIL
Last activity: Mon, Sep 7, 4:59 PM. Reference: t_a7de902d.
Owner: Infrastructure. Access required.
Ask the team →[AUTO-MEJORA] COO mejorar_lane: Implementar dashboard de compra-venta (t_623e5aec)
Last activity: Mon, Sep 7, 4:57 PM. Reference: t_5d7cc897.
Owner: Infrastructure. Access required.
Ask the team →[AUTO-MEJORA] COO probar_modelo_nuevo: Benchmark mlx-community/Qwen3.8-Flash-Next-4bit en sandbox
Last activity: Mon, Sep 7, 4:53 PM. Reference: t_664d3f29.
Owner: Infrastructure. Completion needs verification.
Ask the team →[AUTO-MEJORA] COO mejorar_lane: Verificar si :9130 responde 200
Last activity: Mon, Sep 7, 4:30 PM. Reference: t_caca7d13.
Owner: Infrastructure. Needs a response.
Ask the team →NEEDS_INPUT: semántica de ai.tnmc.hermes-keyless-web-intake
Last activity: Mon, Sep 7, 4:24 PM. Reference: t_1c1d14f7.